Infrastructure & Utilities

Secure and reliable solutions a premier provider
  • Wastewater Treatment Plant

    Wastewater Treatment Plant

    Primary and secondary of Aerated Lagoon (AL) and constructed wetland of 3,200 - 9,600 m3/day (expandable)
    Wastewater treatment is provided through WHAUP Nghe An JSC
  • Water Supply

    Water Supply

    4,000 - 12,000 m3/day (expandable)
    Standard supply 30 m3/ha/day
    Source from Cam River
    Water supply is provided by WHAUP Nghe An JSC
  • Land Elevation

    Land Elevation

    2.50 – 2.70 m. above mean sea level
  • Drainage and Flood Control System

    Drainage and Flood Control System

    Dike at the height of 4.30 m. with drainage pumping system 
    Internal drainage channel, box and pipe culvert system to receive run-off the land plots
  • Road System

    Road System

    Main road with 67 m. right of way, 4 lanes with reinforced concrete pavement 
    Secondary road with 30 m. right of way, 2 lanes with reinforced concrete pavement
  • Power Supply by EVN

    Power Supply by EVN

    2 dedicated transmission lines of 22KV Cua Lo Substation, with capacity of 65 MVA
    110 kV transmission lines available upon application to EVN
  • Medical Care

    Medical Care

    Public hospital & international hospital located within 15 km. 
    Emergency ambulance service available 24/7 nearby 
  • ​Telecommunication

    ​Telecommunication

    Good signal telephone lines 
    Fiber optic for high speed internet
    Wireless internet with various mobile phone packages
  • Emergency Response

    Emergency Response

    Two existing firefighting station located within 10 km. (at Cua Lo) and one new firefighting station located in our industrial zone.
  • Firefighting System

    Firefighting System

    Fire hydrant at every 150 m.
    Large retention ponds for firefighting water reserve